10/27/2019
Tile install!
[envira-gallery id=’797′]
10/26/2019
Front of property cleared of stumps in preparation of the septic. We burned all the stumps and it took over a week!
[envira-gallery id=’793′]
10/24/2019
The tub has arrived – finally. First tub was the wrong one!
[envira-gallery id=’791′]
10/23/2019
Brick stairs and stoop complete.
[envira-gallery id=’789′]
10/18/2019
Installing trim – starting with windows.
[envira-gallery id=’759′]
10/17/2019
Bricking of the front stoop and stairs. Installing Master Closet Window.
[envira-gallery id=’748′]
10/15/2019
Drywall of the first floor.
[envira-gallery id=’749′]
10/14/2019
Framing the Garage Door opening.
[envira-gallery id=’744′]
10/11/2019
Building the bathroom vanities.
[envira-gallery id=’738′]