Skip to content

Ormand Rd

Building Our Dream Home

  • Progress
  • Plans
  • Full Gallery
Scroll down to content

Posts

Posted on October 28, 2019November 14, 2019

10/28/2019

[envira-gallery id=’803′]
Posted on October 27, 2019November 14, 2019

10/27/2019

Tile install!

[envira-gallery id=’797′]
Posted on October 26, 2019November 14, 2019

10/26/2019

Front of property cleared of stumps in preparation of the septic. We burned all the stumps and it took over a week!

[envira-gallery id=’793′]
Posted on October 24, 2019November 14, 2019

10/24/2019

The tub has arrived – finally. First tub was the wrong one!

[envira-gallery id=’791′]
Posted on October 23, 2019November 14, 2019

10/23/2019

Brick stairs and stoop complete.

[envira-gallery id=’789′]
Posted on October 19, 2019

10/18/2019

Installing trim – starting with windows.

[envira-gallery id=’759′]
Posted on October 17, 2019October 19, 2019

10/17/2019

Bricking of the front stoop and stairs. Installing Master Closet Window.

[envira-gallery id=’748′]
Posted on October 15, 2019October 19, 2019

10/15/2019

Drywall of the first floor.

[envira-gallery id=’749′]
Posted on October 14, 2019October 19, 2019

10/14/2019

Framing the Garage Door opening.

[envira-gallery id=’744′]
Posted on October 11, 2019October 19, 2019

10/11/2019

Building the bathroom vanities.

[envira-gallery id=’738′]

Posts navigation

Previous page Page 1 Page 2 Page 3 … Page 8 Next page
Proudly powered by WordPress