Skip to content

Ormand Rd

Building Our Dream Home

  • Progress
  • Plans
  • Full Gallery
Scroll down to content

Posts

Posted on October 3, 2019October 19, 2019

10/03/2019

Framing the stairwell opening in the garage.

[envira-gallery id=’724′]
Posted on October 2, 2019October 19, 2019

10/02/2019

Drywall delivery!

[envira-gallery id=’718′]
Posted on October 1, 2019November 14, 2019

10/31/2019

Garage door install.

[envira-gallery id=’819′]
Posted on October 1, 2019October 19, 2019

10/01/2019

Concrete pouring of the garage pad, stairs pad and stoop top.

[envira-gallery id=’712′]
Posted on September 24, 2019October 19, 2019

09/24/2019

Reframing the porch doorway because the framers did it wrong and framed the showers for tiled shelves.

[envira-gallery id=’703′]
Posted on September 15, 2019September 16, 2019

09/15/2019

Garage backfilled to prep for concrete pad.

[envira-gallery id=’682′]
Posted on September 13, 2019September 16, 2019

09/13/2019

Building mudroom deck, more plumbing and roof felt paper complete.

[envira-gallery id=’677′]
Posted on September 12, 2019September 16, 2019

09/12/2019

Felt papering the roof and house wrap.

[envira-gallery id=’669′]
Posted on September 11, 2019September 16, 2019

09/11/2019

[envira-gallery id=’667′]
Posted on September 10, 2019September 11, 2019

09/10/2019

Gables going up. One more to go.

[envira-gallery id=’663′]

Posts navigation

Previous page Page 1 Page 2 Page 3 Page 4 … Page 8 Next page
Proudly powered by WordPress