Skip to content

Ormand Rd

Building Our Dream Home

  • Progress
  • Plans
  • Full Gallery
Scroll down to content

Posts

Posted on September 9, 2019

09/09/2019

Shield Tech going up on main roof.

[envira-gallery id=’656′]
Posted on September 7, 2019September 9, 2019

09/07/2019

Plumbing going in. Pot filler, fridge and powder bath.

[envira-gallery id=’644′]
Posted on September 6, 2019September 9, 2019

09/06/2019

Roof and Gable sides going up.

[envira-gallery id=’647′]
Posted on September 5, 2019September 5, 2019

09/05/2019

Installing rafters on the main house.

[envira-gallery id=’627′]
Posted on September 4, 2019September 5, 2019

09/04/2019

Finishing sheathing on the garage and putting up ShieldTech.

[envira-gallery id=’634′]
Posted on September 3, 2019September 5, 2019

9/3/2019

Installing rafters on the garage and mudroom.

[envira-gallery id=’613′]
Posted on September 2, 2019September 3, 2019

9/2/2019

[envira-gallery id=’611′]
Posted on August 29, 2019August 30, 2019

08/29/2019

OSB almost complete. Electrical Rough-IN. Selecting our Hardwoods!

[envira-gallery id=’587′]
Posted on August 28, 2019August 30, 2019

08/28/2019

Nate had to punch out some brick for the electrical. OSB on second floor and electrical install begins.

[envira-gallery id=’579′]
Posted on August 27, 2019August 28, 2019

8/27/2019

[envira-gallery id=’571′]

Posts navigation

Previous page Page 1 … Page 3 Page 4 Page 5 … Page 8 Next page
Proudly powered by WordPress