[envira-gallery id=’567′]
08/22/2019
Second story walls going up.
[envira-gallery id=’560′]
08/21/2019
Center Beam for Garage and Subfloor on the second floor.
[envira-gallery id=’494′]
08/20/2019
Second story joists are in – we’ve got one sturdy floor!
[envira-gallery id=’88’]
08/15/2019
Putting on the top plate and more tree clean up.
[envira-gallery id=’445′]
08/14/2019
First floor framing 90% done.
[envira-gallery id=’87’]
07/30/2019
First floor framing. Lots of doors and windows!
[envira-gallery id=’86’]
07/29/2019
[envira-gallery id=’85’]
07/24/2019
First floor deck is complete and awaiting inspection.
[envira-gallery id=’444′]
07/23/2019
First floor decking installation.
[envira-gallery id=’84’]
